Building Restoration

As you may have noticed while reading about our Sustainibility & Growth plan, we’re conceptualizing the project in three phases. The first phase focuses on executing the construction necessary to make the P.O. into a functional, accessible community space.

We’ve come a long way already, but we still have quite a ways to go.

Left: Summer 2024. Carefully transferring a box of USPS Postmaster Manuals, found in the eaves of the P.O., from their decrepit original card-board to a safe plastic tote to protect them from the elements.

Updates to Phase 1, Summer 2025:

Phase 1 involves several major projects:

The PO doesn’t have electricity, but a generator and solar panels have been donated for installation this summer. It also doesn’t currently have a restroom. This is a significant obstacle. Installation of a water collection system and accessible restroom are an important part of Phase I.

Follow us on Instagram and Facebook for regular pics and video of our progress, and watch this space for big updates as we move toward Phase II.